Grow a design
medium 35 minStart with the smallest system that does the job.
See it run
One break, one fix, one cost. Then practise stopping.
Operations
The growth log
Library seats. Write one line for each version in the corner of the board.
Step 1 of 4
Version 1
| Version | Breaks | Fix | Cost |
|---|---|---|---|
| 1 | nothing yet | service + database | one thing to run |
| 2 | |||
| 3 | |||
| stop |
One service and one database, with a unique rule on seat and slot. Correct from the start.
Step 1: Version 1
- When
- Minutes 15 to 25
- You leave with
- A reason for every box
If a line has an empty cell, you have not finished that step.
In the real world
The same grow a design doing real jobs. Pick one and step through it.
Four moments. Decide before you press next.
Step 1 of 8
Moment 1
| Situation | Grow or stop? |
|---|---|
| 600 reads/s | Grow |
| Stop |
600 page reads a second on one database planned for 10,000.
Step 1: Moment 1
Common mistakes
The bugs interviewers watch for, with the fix beside each.
Everything at once
criticalNo box has a reason and no path is followed.
Wrong"Here is the full architecture."Right"Version 1 works. Its first break is..."A break without a number
majorNobody can tell whether it is real.
Wrong"The database will be slow."Right"10,000 reads a second, at our planning line."A careless version 1
criticalSmall does not mean wrong.
Wrong"We will handle double booking later."Right"A unique rule, from the first version."Never stopping
majorEach extra part is cost and questions.
Wrong"And then a service mesh..."Right"Targets are met. I stop here."
Interview tips
Per version
- It breaks here.
- So I change this.
- It costs this.
- Next limit.
Fixes, in order
- Remove load.
- Grow what you have.
- Add one part.
To stop
- Tick the targets.
- Say what is not built.
- Give the trigger.
Settle early
- The main key.
- Where data may live.
- Public calls.