Mid, senior and staff
easy 30 minThe question is the same for everyone.
Video lesson · Chapter 1 of 5
The same burst, different depth
One question, three levels
1:25Reel coming soon
Theory
Read or listen first. About 1 min.
What it is
A level describes how much responsibility a role carries. Mid, senior and staff are common names. The same prompt is judged differently for each.
The difference is in depth, initiative and how far you look ahead, not in using more boxes.
Why it exists
Knowing what is expected helps you prepare the right thing. A mid-level candidate should finish a sound design. A staff candidate should reshape the problem.
It also helps when a company offers a different level from the one you expected.
A short history
Middle Ages
Craft guilds in Europe recognise apprentices, journeymen and masters.
1980
Stuart and Hubert Dreyfus describe five stages of skill, from novice to expert.
2000s onwards
Technology companies build ladders that let engineers grow without becoming managers.
Words to know
- Scope
- How much of the problem is yours.
- Initiative
- How much you lead without being asked.
- Down-levelling
- Being offered a lower level.
- Ladder
- A company's written levels.
- Influence
- Getting things done through others.
How it works
Step through the idea, or press Play.
Mid. Builds a correct design and explains it
Understand it
Start here
Three people on one mountain
A walker, a guide and an expedition leader can stand on the same path. They are asked the same thing: get to the top. They do different jobs.
Compare
Depth, initiative, explanation
| Mid | Senior | Staff | |
|---|---|---|---|
| Scope | Asks what it must do | Proposes scope and targets | Asks why, and makes it smaller |
| Design | Correct and complete | Each part tied to a target | Routine parts in seconds |
| Depth | One part, when asked | Two parts, unprompted | The crux, early and long |
| Choices | Two options, one reason | Reason, cost, trigger | Adds reversing and migrating |
| Failure | What if this box is down | Where the load goes | How we notice and who acts |
| Who leads | Candidate, with help | Candidate | Two colleagues |
| Explaining | How each part works | Why this part | Only what is not obvious |
Each level keeps the one below
Time
Where the minutes go
| Phase | Mid | Senior | Staff |
|---|---|---|---|
| Scope | 5 | 4 | 5 |
| Numbers | 5 | 3 | 3 |
| API and data | 5 | 4 | 2 |
| Design | 10 | 9 | 5 |
| Deep dives | 15 | 20 | 25 |
| Wrap-up | 5 | 5 | 5 |
They all add up
How much to explain
Mid: explain how
"A load balancer spreads requests over three copies." Show that you know the parts you draw.
Senior: explain why
"Three copies, so that two can carry the peak." The part itself needs one word.
Staff: explain what is not obvious
"Stateless, the usual." Then straight to the risk that nobody else would list.
Problem 1
Seat booking: the rush at 9:00
The prompt: 5,000 readers want 80 seats when booking opens. What do you do?
Mid
You
The booking service writes to one database. A unique rule on seat and slot means the second reader is refused. Reads of the map come from a cache that is two seconds old.
Interviewer
And when all 5,000 arrive?
You
Most writes will fail, which is correct but is a lot of load. I could run more copies of the service. The database may become slow, so I would put the requests in a line and let them through at a rate it can serve.
Senior
You
Correctness first: a unique rule decides. The crux is load. At least 4,920 of 5,000 must be refused, so I put a waiting room in front that admits about 200 a second. That clears the line in 25 seconds. It costs one more part and some waiting. If the waiting room fails, the service admits a fixed number and turns the rest away with a time to retry.
Interviewer
Is that fair?
You
First come favours fast networks. I would shuffle everyone who arrived before nine. The trigger to drop all this is a building with more seats than readers.
Staff
You
Before I build for a rush, why is there one? If everything opens at nine, we made the rush. I would ask the libraries about opening in waves by building, or a draw overnight. A draw needs no waiting room and is fairer.
Interviewer
They insist on nine o'clock.
You
Then the waiting room, as small as possible. I would launch in two buildings, watch refused bookings and waiting time, and switch it on by building with a flag, so we can go back in a minute. The weak point is support: staff at the desk need to know what a reader sees. I would agree that before launch.
Problem 2
URL shortener: unique codes
| Mid | Senior | Staff | |
|---|---|---|---|
| Says | "Count up and encode in base62." | "Lease a million numbers per server, scramble, encode." | "Do codes need to be short, or hard to guess? That decides it." |
| Number | Seven characters is about 3.5 trillion | 182.5 billion links in five years is about 5% of that | One lease covers a million creates, so the coordinator barely matters |
| Failure | "Two servers could clash, so check on insert." | "A crash wastes the rest of a range. Fine." | "A restored backup could hand out old ranges. The conditional write must stay." |
| Beyond | A custom alias | Multi-region claims go to one home region | How to change code length later without breaking printed links |
The same sum, used three ways
Problem 3
School bus tracker: private positions
| Mid | Senior | Staff | |
|---|---|---|---|
| First move | Sign-in, then show the bus | "The worst failure is a stranger seeing a stop, so access comes before speed." | "Which laws and school rules apply, and who approves access?" |
| Design | Check that the parent has a child on that bus | Check on every read; keep only the latest position; short-lived links | Store as little as possible: no history unless the school asks |
| Failure | "Deny when the check fails." | "If the access service is down we refuse. A late bus is better than a leak." | Alerts on odd viewing, an access log, and a way to cut off one account |
| Cost named | Slower reads | A wrong refusal at 7:45; a phone number to call | Support load, school training, an audit each year |
Prepare
What to practise
| For | Build | Practise | Proof you are ready |
|---|---|---|---|
| Mid | The parts: database, cache, queue, load balancer, and when each is needed | Finish a whole design in 25 minutes | A friend can redraw it |
| Senior | Failure drills, races, consistency per operation | Two deep dives without being asked | You give the cost before they ask |
| Staff | Migrations, rollout, cost, ownership, stories from your own work | Making a prompt smaller in three minutes | You can say what you would not build, and why |
One exercise for all levels
- 1
Answer a prompt at your current level
Record it. Twenty-five minutes.
- 2
Listen once
Count three things: numbers used, costs named, times you led.
- 3
Answer again, one level up
Only the deep dive. Add cost and failure, or rollout and reversing.
- 4
Keep what was real
Drop anything you could not explain if asked twice.
Moved
Down-levelled and up-levelled
Interviewers may decide that your answers fit a different level from the one you applied for. It is a judgement about one day's evidence, not about you.
If the level moves down
| Why it moves down | What they saw | What to change |
|---|---|---|
| Waited to be led | Good answers, no next step | Offer the next step after each answer |
| Stayed broad | Many boxes, no decision | Two dives that end in a choice |
| No costs | Every option was good | Name the price first |
| Skipped the basics | Rollout talk, broken main path | Make it correct, then widen |
Asking about it
You
Thank you for the offer. I applied at senior and this is mid. Could you share which signals were missing in the design round?
Interviewer
The design was sound. You needed prompting for failure cases.
You
That is fair and useful. Is another design conversation possible? If not, I would like to understand what the step to senior looks like in this team.
Moving up is rarer and happens when someone leads, decides and looks after consequences without help. If it is offered, ask what the first six months would expect of you. A higher title with a role you do not want is not a win.
Stop
What to stop doing
Start
- Mid: naming the hard part yourself
- Mid: finishing before polishing
- Senior: breaking your own design
- Senior: saying what is not needed
- Staff: leaving obvious parts unexplained
- Staff: asking what happens if we do nothing
Stop
- Mid: waiting for the next question
- Mid: adding parts to look advanced
- Senior: reciting how a cache works
- Senior: answering every hint with a new box
- Staff: ten minutes on endpoints
- Staff: opinions with no number and no test
Which level did that sentence sound like?
Going up a level in one answer
Summary
The whole topic in one minute.
Mid shows a complete design, senior leads and goes deep, staff shapes the problem and its consequences.
Explain less of the basics and decide more as the level rises.
- Same prompt, different job: solve it, lead it, shape it.
- Each level keeps the one below. Correct comes first.
- Higher levels spend less time on ordinary parts and more on the crux.
- Explain how, then why, then only what is not obvious.
- If you are moved, ask which signals were missing.